CELEBI GROUND HANDLING 2023 ANNUAL REPORT

30 Çelebi Ground Handling Inc. 2023 Annual Report The table below provide information regarding the power plants: Detailed Information on Solar Power Plants Parameter Technical Building Cargo Building Investment Cost (TL) 86,589 157,632 Installation Area (m 2 ) 240 528 Energy Generation (kWh per year) 17,800 Greenhouse gas emission savings (CO 2 e per year) 8.5 All the energy generated by the power plants was utilized. With the exception of the stated power plants, no electricity, heat, steam, or other forms of energy were generated by our Company during the reporting period. 6. Water Management The responsibility for managing water and other natural resource consumption within our Company is assigned to the Station Managements in our operation units. As per our Environmental Policy and functional targets, we conduct activities to minimize water consumption in accordance with the guidelines outlined in our “I-TR01-10000676-004 Energy and Natural Resource Management Instruction”. During the Annual Management Review meetings, the topics of discussion include water consumption amounts, reduction and improvement efforts. The airports we serve utilize mains water as their primary water source. The quality of the water is ensured by both the airport authority and our Company through regular drinking water analyses conducted by relevant institutions. Regarding water safety, on which our Company management focuses sensitively, our priority is to treat our industrial wastewater and discharge it safely, well below the discharge limits. In this context, we are committed to using water resources efficiently by aiming to recycle at least 40% of the amount of water we spend during our activities with the advanced chemical treatment systems we have installed in two different locations at İstanbul Airport. In this way, we ensure continuous improvement by controlling our environmental impact. Advanced Chemical Treatment Plant Features Parameter Features Plant Capacity (m 3 /day) 15 Investment Cost (Euro) 79,900 Our wastewater treatment facility was awarded the “GREEN FLAG” award by TOBFED (Federation of Automotive Maintenance Associations of Turkey) at the 3 rd Sustainable Future Summit, with the implementation of the İstanbul Airport Vehicle and Equipment Washing Areas Wastewater Recovery Project. BOARD OF DIRECTORS 2023 Annual Report

RkJQdWJsaXNoZXIy MTc5NjU0